<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>金鑫圣环保</title>
	<atom:link href="http://www.jeptc.com/cn/feed" rel="self" type="application/rss+xml" />
	<link>http://www.jeptc.com/cn</link>
	<description></description>
	<lastBuildDate>Sat, 23 Dec 2017 07:01:42 +0000</lastBuildDate>
	<language>en-US</language>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.9.22</generator>
	<item>
		<title>Tangshan Xinrui Electronic Waste Water Treatment Engineering</title>
		<link>http://www.jeptc.com/cn/cases/189.html</link>
		<comments>http://www.jeptc.com/cn/cases/189.html#comments</comments>
		<pubDate>Tue, 03 Oct 2017 05:20:50 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[成功案例]]></category>

		<guid isPermaLink="false">http://www.jeptc.com/cn/?p=189</guid>
		<description><![CDATA[The Project is one of the main projects newly built in Hebei Province in 2015, jointly invested by China and Korea, with the total investment to be RMB one billion.

The Project is located in Guye District in Tangshan, in which hyperfine flexible printed circuit board (FPCB) and rigid-flexible circuit board are produced.

The Project belongs to heavy metal waste water, with water volume of 400 m3/d, in which the process of "chemical treatment +A/O+MBR +catalytic oxidation" is adopted, and outflow meets Grade 1 A in "Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant" (GB 18918-2002).

The Project is EPC contracting project, with the total construction period (design, supply, construction and commissioning) of 115 calendar days.

<a href="http://www.jeptc.com/cases/116.html/attachment/cases_tangshanxinrui_01" rel="attachment wp-att-117"><img class="aligncenter size-full wp-image-117" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangshanxinrui_01.jpg" alt="cases_tangshanxinrui_01" width="638" height="430" /></a>

<a href="http://www.jeptc.com/cases/116.html/attachment/cases_tangshanxinrui_02" rel="attachment wp-att-118"><img class="aligncenter size-full wp-image-118" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangshanxinrui_02.jpg" alt="cases_tangshanxinrui_02" width="638" height="430" /></a>]]></description>
				<content:encoded><![CDATA[<p>The Project is one of the main projects newly built in Hebei Province in 2015, jointly invested by China and Korea, with the total investment to be RMB one billion.</p>
<p>The Project is located in Guye District in Tangshan, in which hyperfine flexible printed circuit board (FPCB) and rigid-flexible circuit board are produced.</p>
<p>The Project belongs to heavy metal waste water, with water volume of 400 m3/d, in which the process of &#8220;chemical treatment +A/O+MBR +catalytic oxidation&#8221; is adopted, and outflow meets Grade 1 A in &#8220;Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant&#8221; (GB 18918-2002).</p>
<p>The Project is EPC contracting project, with the total construction period (design, supply, construction and commissioning) of 115 calendar days.</p>
<p><a href="http://www.jeptc.com/cases/116.html/attachment/cases_tangshanxinrui_01" rel="attachment wp-att-117"><img class="aligncenter size-full wp-image-117" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangshanxinrui_01.jpg" alt="cases_tangshanxinrui_01" width="638" height="430" /></a></p>
<p><a href="http://www.jeptc.com/cases/116.html/attachment/cases_tangshanxinrui_02" rel="attachment wp-att-118"><img class="aligncenter size-full wp-image-118" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangshanxinrui_02.jpg" alt="cases_tangshanxinrui_02" width="638" height="430" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.jeptc.com/cn/cases/189.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sewage Treatment Engineering for Key Villages of Tangxian Beautiful Village Construction</title>
		<link>http://www.jeptc.com/cn/cases/187.html</link>
		<comments>http://www.jeptc.com/cn/cases/187.html#comments</comments>
		<pubDate>Tue, 03 Oct 2017 05:20:13 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[成功案例]]></category>

		<guid isPermaLink="false">http://www.jeptc.com/cn/?p=187</guid>
		<description><![CDATA[The Project is invested by Tangxian Xinpeng Urban and Rural Construction Co., Ltd.

The auxiliary projects of "Beautiful Village" construction project of Hebei Province cover five key villages, i.e. Yeli, Gegong, Xishenggou, Yujiazhai and Caozhuangtai in Tangxian County, Baoding City.

The process of "AO + artificial wetland" is adopted in 5 villages. The outflow water meets Grade 1 A in "Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant" (GB 18918-2002).

The Project is EPC contracting projects, with the total construction period (design, supply, construction and commissioning) of 90 calendar days.

<a href="http://www.jeptc.com/news/111.html/attachment/cases_tangxianvillage-_01" rel="attachment wp-att-112"><img class="aligncenter size-full wp-image-112" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangxianvillage-_01.jpg" alt="cases_tangxianvillage-_01" width="638" height="430" /></a>]]></description>
				<content:encoded><![CDATA[<p>The Project is invested by Tangxian Xinpeng Urban and Rural Construction Co., Ltd.</p>
<p>The auxiliary projects of &#8220;Beautiful Village&#8221; construction project of Hebei Province cover five key villages, i.e. Yeli, Gegong, Xishenggou, Yujiazhai and Caozhuangtai in Tangxian County, Baoding City.</p>
<p>The process of &#8220;AO + artificial wetland&#8221; is adopted in 5 villages. The outflow water meets Grade 1 A in &#8220;Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant&#8221; (GB 18918-2002).</p>
<p>The Project is EPC contracting projects, with the total construction period (design, supply, construction and commissioning) of 90 calendar days.</p>
<p><a href="http://www.jeptc.com/news/111.html/attachment/cases_tangxianvillage-_01" rel="attachment wp-att-112"><img class="aligncenter size-full wp-image-112" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_tangxianvillage-_01.jpg" alt="cases_tangxianvillage-_01" width="638" height="430" /></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.jeptc.com/cn/cases/187.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Watercourse Sewage Outlet Treatment Engineering in Nancai Town</title>
		<link>http://www.jeptc.com/cn/cases/185.html</link>
		<comments>http://www.jeptc.com/cn/cases/185.html#comments</comments>
		<pubDate>Tue, 03 Oct 2017 05:19:17 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[成功案例]]></category>

		<guid isPermaLink="false">http://www.jeptc.com/cn/?p=185</guid>
		<description><![CDATA[The treatment scale of the Project is 2,000m3 of drainage per day. The treatment station, operating in 24h, is buried, with sludge dewatering room, ultrafiltration equipment room and guard room, etc. constructed on the ground. All access holes are 200mm out of the ground. Both water level in water tank and equipment operation state are indicated on the control cabinet in equipment room.

The Project, located in the sewage outlet in Hebei Town, Liuyan Hangou, Nancai Town, Shunyi District, Beijing, is under the general contracting of Beijing Xindayu Water Resources Construction Engineering Co., Ltd.

The Project adopts the treatment process of "hydrolization + A/O + UF ultrafiltration". The outflow water meets B standard in "Integrated Discharge Standard of Water Pollutants" (DB11/307-2013).

The Project is equipment EPC contracting project, with the total construction period (supply, construction and commissioning) of 120 calendar days.

<a href="http://www.jeptc.com/cases/104.html/attachment/cases_nancaitown_01" rel="attachment wp-att-105"><img class="aligncenter size-full wp-image-105" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_nancaitown_01.jpg" alt="cases_nancaitown_01" width="638" height="430" /></a>

<a href="http://www.jeptc.com/cases/104.html/attachment/cases_nancaitown_02" rel="attachment wp-att-106"><img class="aligncenter size-full wp-image-106" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_nancaitown_02.jpg" alt="cases_nancaitown_02" width="638" height="430" /></a>

&#160;]]></description>
				<content:encoded><![CDATA[<p>The treatment scale of the Project is 2,000m3 of drainage per day. The treatment station, operating in 24h, is buried, with sludge dewatering room, ultrafiltration equipment room and guard room, etc. constructed on the ground. All access holes are 200mm out of the ground. Both water level in water tank and equipment operation state are indicated on the control cabinet in equipment room.</p>
<p>The Project, located in the sewage outlet in Hebei Town, Liuyan Hangou, Nancai Town, Shunyi District, Beijing, is under the general contracting of Beijing Xindayu Water Resources Construction Engineering Co., Ltd.</p>
<p>The Project adopts the treatment process of &#8220;hydrolization + A/O + UF ultrafiltration&#8221;. The outflow water meets B standard in &#8220;Integrated Discharge Standard of Water Pollutants&#8221; (DB11/307-2013).</p>
<p>The Project is equipment EPC contracting project, with the total construction period (supply, construction and commissioning) of 120 calendar days.</p>
<p><a href="http://www.jeptc.com/cases/104.html/attachment/cases_nancaitown_01" rel="attachment wp-att-105"><img class="aligncenter size-full wp-image-105" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_nancaitown_01.jpg" alt="cases_nancaitown_01" width="638" height="430" /></a></p>
<p><a href="http://www.jeptc.com/cases/104.html/attachment/cases_nancaitown_02" rel="attachment wp-att-106"><img class="aligncenter size-full wp-image-106" src="http://www.jeptc.com/wp-content/uploads/2017/09/cases_nancaitown_02.jpg" alt="cases_nancaitown_02" width="638" height="430" /></a></p>
<p>&nbsp;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jeptc.com/cn/cases/185.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>全新官网上线</title>
		<link>http://www.jeptc.com/cn/news/38.html</link>
		<comments>http://www.jeptc.com/cn/news/38.html#comments</comments>
		<pubDate>Sun, 27 Aug 2017 01:55:29 +0000</pubDate>
		<dc:creator><![CDATA[admin]]></dc:creator>
				<category><![CDATA[新闻动态]]></category>

		<guid isPermaLink="false">http://www.jeptc.com/cn/?p=38</guid>
		<description><![CDATA[全新官网上线。]]></description>
				<content:encoded><![CDATA[<p>全新官网上线。</p>
]]></content:encoded>
			<wfw:commentRss>http://www.jeptc.com/cn/news/38.html/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
